The Aarhus Concert Hall, expanded to 33,000 m² in 2007, hosts 700,000 annual visitors across 1,000 performances. Legacy fixed-speed ventilation systems wasted energy continuously. NOVENCO's 12 ZerAx® air handling units delivered 50% energy reduction, 170 tons lower CO2 emissions, and annual savings exceeding 67,000 EUR.
The climate challenges and UN goals for 2030 drive manufacturers worldwide to implement sustainable production solutions. Paint-spray operations present particular challenges due to their high energy consumption and stringent air quality requirements.
NOVENCO was awarded the contract for design and delivery of a complete smoke clearance system with jet fans for the underground car park. Five storeys are now highly protected by an advanced operating system.
The BLOX complex is home of the Danish Architecture Centre and the BLOXHUB. BLOX's fully automated car park equipped with safe NOVENCO jet fans.
NOVENCO was awarded the contract for the system design, equipment delivery, commissioning and system approval for the BMW Museum visitor car park.
The car park ventilation system delivered by NOVENCO Building & Industry complies with the US standards Ashrae and AMCA for air quality and fan requirements.
According to Carlsberg's energy consultant Bjarne Pedersen, the promised savings have already been achieved, before the adjustment of the ventilation.
NOVENCO's ZerAx® axial fans transform Frankfurt Airport Terminal 2 ventilation infrastructure, delivering exceptional efficiency improvements whilst reducing environmental impact across six air handling chambers.
India's leading tyre manufacturer transforms energy efficiency with innovative EC+ technology and ZerAx® retrofits.
Energy inefficiency in underground car park ventilation creates operational challenges. Continuous manual fan operation drives unnecessary power consumption while failing to optimise air quality based on actual CO concentrations.
CS Gruppen A/S operates Denmark's largest food logistics network, processing 250-300 tonnes daily at their Padborg facility while maintaining critical temperature control for food safety compliance.
This Northern Scandinavian facility leverages natural free cooling for unprecedented power usage effectiveness, spanning 13 football fields with 120 GW power usage.
Strategic technical partnership between Danfoss and NOVENCO delivers integrated AHU systems with exceptional energy efficiency.
Advanced life safety ventilation systems for the A9 motorway expansion between Schiphol Airport and Almere, featuring certified smoke control and longitudinal ventilation across five tunnel tubes.
High-rise residential developments require sophisticated fire safety and ventilation solutions. The Grotius towers in The Hague demonstrate advanced system integration for complex building requirements.
The 18-storey Keppel Bay Tower achieved Green Mark Platinum (Zero Energy) certification from Singapore's Building and Construction Authority (BCA), becoming the city's first commercial building to meet these stringent performance standards.
NOVENCO® Building & Industry delivered fire safety engineering with certified ClearChoice™ dual smoke control systems for luxury residential development.
NOVENCO Building & Industry delivered a comprehensive ventilation solution for one of the Netherlands' largest underground car parks, featuring advanced air management systems across five levels.
Denmark's largest hospital achieves remarkable energy savings through systematic ventilation system modernisation.
Project Meander II Amsterdam reduced energy consumption and improved reliability by replacing aging fans with advanced NOVENCO® ZerAx® axial fans.
Underground power station retrofits challenge installation teams with tight deadlines and complex access requirements. Sima Power Station, Norway's second largest hydro-electric facility, required immediate ventilation upgrade for its mountain facility located 700 metres underground.
The Dharampal Satyapal Group demonstrates measurable efficiency improvement through systematic ZerAx technology implementation across their LEED Platinum certified headquarters facility.
Comprehensive smoke control system integrating EN12101-3 compliant ZerAx fans for 758-room modular student accommodation and affordable housing development, achieving BREEAM Excellent certification.
Reliable ventilation for extreme depth mining operations with advanced efficiency and sustainability benefits.
When Oxford's historic Westgate Centre needed reconstruction after 40 years, contractors faced complex installation challenges across multiple zones requiring proven ventilation expertise.
Mercedes-Benz's modern office building in Nieuwegein, Netherlands, follows Daimler's MeWe Space concept, integrating creativity and functionality across multiple business divisions.
Systematic evaluation of high-efficiency axial fans delivers measurable performance improvements at Volkswagen Navarra production facility in Pamplona, Spain.
The Heinenoord Tunnel, a 614-metre road tunnel on the A29 highway, opened in 1969 as a critical connection between Rotterdam and the Zeeland and South Holland Islands. By 2023, Rijkswaterstaat, the Dutch Ministry of Infrastructure, mandated comprehensive safety upgrades to meet current regulatory requirements.
Advanced pressure differential system for a leading German insurance high-rise
NOVENCO Building & Industry has delivered an advanced pressure differential system for a 21-storey German insurance headquarters. The project required exceptional safety performance, prompting the development of ultra-fast louvre actuators with a 0.7-second response time – a market first. Together with new control software and innovative air distribution, the solution ensures safe evacuation, reliable fire brigade access and long-term system stability.
With this installation, NOVENCO sets new benchmarks in high-rise fire safety and demonstrates how modern pressurisation systems can support the safety demands of today’s tallest commercial buildings.
Scheveningse Duyn residential complex required complete car park ventilation replacement after 30 years, replacing obsolete roof-mounted fans with modern ceiling-mounted jet fans to achieve NEN 2443 compliance.
Zott SE & Co. KG modernised cooling systems at their Mertingen dairy plant, replacing 120 aging fans whilst maintaining continuous production. The retrofit delivered exceptional energy performance and operational reliability.