The project
In 2022, NOVENCO Building & Industry was appointed to design and deliver a complete active pressure differential system for a new 75 m tall office tower. The system includes active PDS installations for two safety stairwells, a fire brigade lift and two exhaust shafts. Together they secure safe evacuation routes and dependable fire brigade access.
NOVENCO supplied all critical components. These include supply and exhaust fans, advanced louvre dampers with ultra-fast actuators, control cabinets with new control software and smoke extraction dampers. After independent certified inspection, the full system received approval at the start of 2025.
The challenge
During the project, regulatory specialists introduced more demanding technical requirements to achieve top-tier safety levels. The challenge was to meet these requirements and future-proof the installation. The goal was to enable pressure differential systems to operate reliably even in much taller buildings.
To meet the strict criteria and raise system performance, NOVENCO’s engineering team in the Netherlands developed several innovations:
Facts
The project was completed and approved in early 2025. The delivered pressure differential system is robust, responsive and future-ready. It ensures safe evacuation and secure access for the fire brigade. The innovations introduced here expand NOVENCO’s capabilities and support PDS solutions for much taller buildings. They set new standards in fire safety for high-rise insurance and commercial properties.