The renovation programme addressed multiple technical installations whilst implementing a central escape passage between the two tunnel tubes. This created distinct engineering requirements:
The dual-system configuration addressed separate safety functions. Tunnel tubes required effective smoke control to maintain tenable conditions during evacuation. The escape passage required positive pressurisation to prevent smoke ingress, ensuring a protected evacuation route.
Specifications demanded reliable performance under emergency conditions whilst integrating with renovated control systems. Equipment selection prioritised compatibility with existing infrastructure and compliance with Dutch safety standards.
NOVENCO® Building & Industry supplied 19 AUR-1250 jet fans for longitudinal smoke control:
The jet fan configuration reduces installation complexity whilst simplifying maintenance access. Each unit mounts to the tunnel ceiling, enabling straightforward periodic inspection and service.
The pressurisation specification comprised four fans delivering positive pressure to the escape passage:
This configuration maintains positive pressure throughout the escape tunnel, ensuring compliance with Dutch safety regulations for protected evacuation routes.
NOVENCO designed, supplied and commissioned both ventilation systems, coordinating installation with the tunnel's renovated electrical and control infrastructure. The programme integrated with other trades to minimise schedule disruption.
Commissioning procedures validated system performance:
The completed installation delivers compliant ventilation across both safety functions. The jet fan system provides effective smoke control throughout tunnel tubes. The pressurisation system maintains protected conditions in the escape passage.
The renovation extends operational life whilst meeting current safety standards. Ventilation systems operate efficiently during normal conditions and respond reliably in emergency scenarios.
The Heinenoord Tunnel operates to contemporary safety standards following the 2023-2024 renovation. The dual ventilation approach addresses tunnel smoke control and escape route pressurisation, satisfying regulatory requirements established by Rijkswaterstaat.
The installation demonstrates capability in complex infrastructure projects requiring integration with existing structures. The project provides reference data for tunnel renovation specifications requiring compliant ventilation systems and retrofit integration with legacy infrastructure.